Venture: Nebula map renderer, production build

BuildingVentureRights: Original ✓

A production build of the Nebula renderer under a three-milestone plan. tinker has claimed it, milestone one is delivered and public, and the first patron vote is open. Every milestone releases publicly before patrons vote, and a stall does not close the repository.

Requested by Arden · creator tinker · 4 patrons
Track milestonesMilestonesDiscussionOpen general thread
Share

Link to this project — stable and shareable:

Building · Milestone 2 of 3 · M2 delivery deadline closes Tue 10 Nov 19:01 UTC — 32d 11h ago
locked 128.00 WAID · 4 supporters · 0 private — all counted · ❄ terms frozen 2026-09-29
1PledgeChoose an amount; it is exposed at the current milestone.
2EscrowThe money sits in the milestone contract. The creator is paid only after a delivered milestone you stay for.
3Leave at any milestone decision pointTake back the unspent part at every milestone decision point.

At each milestone decision point, STAY is automatic — the only action is to LEAVE. If you leave, the leave calculator shows the exact amount returned before you act. Every delivered milestone publishes a public deliverable with a recorded SHA-256.

Terms are locked when a creator's plan is accepted and the first milestone starts; until then these are draft terms. No platform fee is taken.

Rights & project money

Original

Project money (pledges and contributions) is open: the rights status is Original.

Contributions

simulated WAID

Ongoing contributions add simulated WAID straight to the project pool (fee 0). Contributions follow the project's pledge/refund rules and are recorded separately for transparency.

Contributions
⚡ 0.00

Sign in to contribute simulated WAID.

The project owner can change this status in their project settings; project money is gated server-side.

Milestones (3) · live milestone: M2

  1. M1

    Core renderer and tile pipeline

    passed
    target 100.00 WAIDcreator share 20%delivery target 2026-10-29

    Done means: Three sample maps render under 2s each on CPU; legend readable at 400px; unit tests cover the projection; public source at the recorded URL.

    Deliverable: https://example.org/nebula-renderer

    SHA-256: 799e57a3…e92136

    32.00 WAID released · 0.00 WAID refunded · 4 stayed · 0 left

    💬 Discussion · 7
  2. M2

    Interactive map editor and lens layers

    buildinglive milestone
    target 80.00 WAIDcreator share 30%delivery target 2026-11-10

    Done means: A patron can edit a route in under 30 seconds without JSON; lens toggles preserve zoom; public release before the vote.

    💬 Discussion · 7

    Decision window: 32d 11h ago (Tue 10 Nov 19:01 UTC)

    The creator is building this milestone against the committed pool. Pledges are locked between boundaries; the next decision point is the review window when the deliverable is published.

  3. M3

    Public release: documentation, module, licence

    proposed
    target 40.00 WAIDcreator share 50%delivery target 2026-11-21

    Done means: Builds from a clean checkout on the documented toolchain; README walked end to end by a non-programmer; MIT licence file present.

    Deliverable will be published the moment this milestone completes.

    💬 Discussion · 7

Share timeline — creator's cut per milestone (the rest stays in the contract)

M120%
M230%
M350%

Back-loaded — most value is released in the later milestones. Shares across the plan are stated as percentages of each pledge; the rest stays in the contract.

About this project

License: Waidrn License · platform fee 0% · these terms are frozen · terms version 1

Delivery evidence

  • M1 · Core renderer and tile pipelinereleased32.00 WAID released to creator

    Deliverable: https://example.org/nebula-renderer

    SHA-256: 799e57a3…e92136

    Tagged v0.1.0 build, source plus a 4-page integration note.

    Delivered 2026-10-29 · Settled 2026-12-01 · 4 stayed · 0 left · 0.00 WAID refunded

Public ledger (aggregates only)

  1. Nova backed with 60.00 WAID
  2. Mira backed with 50.00 WAID
  3. Vesper backed with 30.00 WAID
  4. quill backed with 20.00 WAID
  5. Proposal created →
  6. tinker proposed a claim
  7. Claim accepted by patrons — project picked up
  8. Milestone 1 “Core renderer and tile pipeline” delivered: https://example.org/nebula-renderer →
  9. Milestone 1 settled — creator paid 32.00 WAID, leavers refunded 0.00 WAID →

Ledger rows never identify per-patron pledges; hidden-money totals are aggregate-only.

Discussion & updates

Open a thread to read it

Milestone announcement and review threads are created automatically when a rung starts or its deliverable is published. The review thread is the deliberation space during a STAY/LEAVE window; votes themselves stay silent and only aggregate results are published after the decision window ends.

Browse all boards

Lineage & record

Creator record (factual)

Completions: 0 · delivered milestones on time: 1 of 1 · stay-rate across settled decision points: 100% · last update 2026-11-01

Data with dates, not a reputation score; the cohort prediction model is Phase 0.5 (needs a ≥30-project cohort).

  • Original project (no parent).
  • Forks: none yet
  • Contract hash: 28543e72…3c122c
  • Delivered milestones stay public and forkable. Payment is only for delivery.
locked 128.00 WAIDMilestones